By Nadali. Prepared with AI assistance.
On November 23, Google Cloud announced that it had integrated NetApp Volumes with Unified Maintenance. Through December 31, 2026, planned-maintenance notices still go to the old NetApp Volumes Google group alongside Unified Maintenance. After that date, Google will stop sending notices to the group. Unified Maintenance will be the source of planned-maintenance notices.
What this means for the on-call team
The integration covers Flex Unified, Flex File, Standard, Premium and Extreme. If the team responsible for your files or applications relies only on the old group, check the new route before the end of December. Email as a channel is not going away: the documentation describes how to route alerts from Cloud Logging to email or another approved channel.
How to check one pool
- Ask your administrator to identify the project and one storage pool your team owns. In Cloud Hub → Maintenance, look for scheduled or ongoing work. The history covers the past 30 days of completed and canceled events.
- In Cloud Logging, check that the rule matches Unified Maintenance events for NetApp Volumes storage pools. If you have a known event, use it to check the filter. Agree on an on-call channel and a backup recipient in advance.
- Have the owner confirm receipt of the first alert that matches the rule. A matching log entry or no upcoming maintenance is not evidence that a message will reach the on-call team. Do not trigger maintenance just to test delivery.
Takeaway: before the old mailing route ends, confirm who will receive the alert and which pool it identifies. The change concerns planned work. For unplanned incidents, Google documents Personalized Service Health. Nadali did not inspect accounts or test alert delivery or storage.
Related: how to check a separate PHP runtime update on Cloud Run.
Illustrative stock photograph: Brett Sayles / Pexels. It does not depict Google Cloud infrastructure.



